The Project

For every hectare affected by construction, 10 hectares will be restored

For every hectare affected by construction, 10 hectares will be restored •

The Location

Scout Moor II is located on Scout Moor and Rooley Moor, an upland area between Bacup, Rochdale and Rawtenstall, straddling parts of Lancashire and Greater Manchester.​

The site was chosen due to its strong and consistent wind speeds, existing access routes, and proximity to a suitable grid connection point.​

Much of the area comprises open moorland and large parts of the site are designated as common land, with open access and a network of public rights of way, all of which will remain open during the construction and operation of the project.​

Click on the orange hotspots below to see the viewpoints in more detail.

Community Map
Man looking at wind turbines

The Wind Farm at a Glance

Wind Turbine Icon

17 turbines generating enough clean energy to power thousands of homes​

180m icon

Turbines up to 180m tall​

Substation Icon

A new substation

Arrow pointing underground icon

Cables will run underground to reduce visual impact​

Power flash icon

Power will feed into the local grid at Rawtenstall​​

Road icon

Access will be from Scout Road (A680), using the existing quarry entrance​

No access icon

Site access will not be from Rooley Moor Road

Sheep grazing

Moorland Restoration at a Glance

Moorland Icon

346 hectares
of damaged moorland will be restored​

Carbon Cloud Icon

Supports carbon capture, wildlife, cleaner water, and flood resilience

Plan icon

Guided by a detailed Moorland Restoration and Management Plan​

Planting seeds icon

118 hectares fenced for active restoration, including re-wetting and replanting​

Fields icon

228 hectares of common land improved through cutting and grazing plans​

Plant growing between hands icon

Restoration uses proven UK techniques and follows national guidance​

1 = 10 icon

For every hectare affected by construction, 10 hectares will be restored​​

​Read our FAQs to find out more about Scout Moor II

How the Proposals Have Evolved

We have listened closely to the community and key stakeholders through two rounds of consultation (November 2024 and March 2025), along with meetings with councillors, landowners, local groups, and statutory bodies.​

As a result, we have made significant changes:​

  • Reduced the number of turbines from 21 to 17 to address visual and environmental concerns​

  • Adjusted the layout to avoid the deepest areas of peat, increase distance from homes, and protect public rights of way​

  • Removed a turbine near Whitworth in direct response to local feedback​

  • Committed to a £6,000 per MW annual Community Wealth Fund, inflation-linked, independently managed, with a share of revenue if 3% exceeds this amount​

  • Confirmed that Rooley Moor Road will not be used for construction or operational access, with one protected crossing away from heritage sections​

  • Delivered webinars and published clear technical summaries on issues such as noise, peat, shadow flicker, and access​

A full planning application has now been submitted. We will continue to update residents and local groups and welcome ongoing conversations as the project moves forward.​